I checked out the weather forecast for the next week and and it's back to the mid 80's and low 90's. This has to be the driest May, June, and July in all the years I've superintendent at Glendale CC. The rainfall totals from our on course weather station for May through July are listed below.
May 2015 .43 inches Average May rainfall 1.60 inches
June 2015 .16 inches Average June rainfall 1.39 inches
July 2015 .19 inches Average July rainfall .61 inches
Total .78 inches Average May-July 3.6 inches
We have received 22% of the normal rainfall the past three months. Our irrigation system is handling the the job but can only do so much. As long as the temperatures stay below 85 degrees the course stays in pretty good shape. Once we go above 85 degrees the turf goes into panic mode and we start losing areas where the soil is bad and the irrigation coverage is not up to par. South facing bunker slopes are the hardest areas to keep alive during hot dry weather.
The turf team will have to be out in play watering as needed during the late afternoons this next week. They will do their best to not get in your way but there may be a green in which you have to wait several minutes for the water to turn off. Thanks for your understanding during these times.
Steve Kealy
Golf Course Superintendent
Tuesday, July 28, 2015
Monday, June 15, 2015
First Green goes to Chambers Bay
About a month ago I was asked by the USGA to come to Chambers Bay and help do a First Green field trip with a group of local 8th grade students. I assisted Josh Lewis, who isthe golf course superintendent at Chambers Bay. The USGA wanted to video the trip and play it on their website during the US Open to show the partnership with First Green. The video is posted on their site and the link to it is below. It's only 2:12 in length so please check it out. The First Green program is getting a lot of new exposure this week thanks to the USGA!
USGA First Green video
Steve Kealy
Golf Course Superintendent
USGA First Green video
Steve Kealy
Golf Course Superintendent
Thursday, June 4, 2015
First Green video
First Green is a program that partners golf course superintendents with teachers and brings kids out to golf courses to learn STEM (Science, technology, Engineering, and Math) learning. The program was started in 1997 and has had over 15,000 WA State students participate in the program. I've been involved with FG since 1998 and have hosted over 100 field trips at Glendale. The USGA has been our biggest supporter for the past several years and wanted to showcase the program and their support of it during the US Open. I was asked to be part of a PSA (Public Service Announcement) filming that would air during the Open. I flew to Miami during spring break and was part of the cast that was in the filming of the video. It was a great experience being part of the production. The video is live on YouTube as of today and will appear on Fox during the US Open coverage. The ad agency that that was in charge of the production estimates that there will be 120 million viewings of the PSA during the Open. We should get a lot of new interest in the program from around the country!
Click on the link below to go to the USGA First Green video. Check it out, it's only 30 seconds in length. The USGA has asked us to not post this to any social media sites until after June 9th when their PR firm makes the formal release to the media. Thanks!
https://youtu.be/R_j8NLIEjK0
Steve Kealy
Golf Course Superintendent
Glendale Country Club
Kids on a First Green field trip at Glendale CC in April of 2012.
https://youtu.be/R_j8NLIEjK0
Steve Kealy
Golf Course Superintendent
Glendale Country Club
Tuesday, May 5, 2015
New fairway yardage markers
For the past ten years we have used Kirby fairway yardage markers. They set up above the ground slightly and collapse when a mower drives over them. The one advantage they have over every other marker is they are easier to see. But the overwhelming disadvantage is the cost. They look good for one season but have to be replaced after two years of use. The cost becomes too high for the limited life span of the marker. We have chosen to install new fairway yardage markers that are made by the same company that makes our tee yardage markers. The cost is the same as the Kirby markers and should last at least 4-5 times longer.
The new markers look great too.
Steve Kealy
Golf Course Superintendent
Steve Kealy
Golf Course Superintendent
Friday, March 27, 2015
Cart path root removals
The cart paths at Glendale are routed through the trees running along side each fairway. As the trees have matured some have large roots coming under and through the paths causing a very rough road. Last month we had our asphalt contractor take a grinder to the worst areas, remove the roots and re-pave the paths on holes 1&5, 3&4, 7 and 15. Next year we will do the rest of the areas needing repair.
This tree has four large roots coming up through the path.
The grinder is attached to the front of a skid steer Bobcat. It cuts through the asphalt and tree roots like a hot knife through butter.
It only took 25 minutes to grind this section of path.
The grinder has a drum with 3 inch carbide teeth that spins and easily rips through the roots and asphalt.
When the grinding is done the left over material is picked up and hauled away. It's then ready for new asphalt.
The finished path. This is a 450' long section of new path through the trees on the third hole.
This is the tree on the 7th hole that had a root coming up through the path that was at least six inches high. The root is gone and we don't have to drive around this area anymore.
Steve Kealy
Golf Course Superintendent
Friday, January 30, 2015
12th man flag flying high at Glendale CC
This is Superbowl week and to show our team support we mounted a 12th man flag on top of a tree next to the 15th green. Several trees were removed in this area recently and we left one to fly our team flag. The "flag pole" is 109' tall and you can see it from most areas on the back nine.
Looking across from the 17th fairway to #15 green.
We've done our part so now it's up to the Seahawks to bring home another Lombardi trophy with a win over the Patriots on Sunday.
GO SEAHAWKS!
Tuesday, December 2, 2014
Drain line replacement
When Glendale was built 54 years ago, the contractor installed drain lines all over the course. In greens and tees, across fairways, all connecting into 6", 8", 10", or 12"lines running from the high side of the course and discharging into one the creeks. Usually they supply a set of as-built plans so the owner knows the location of all the lines for future use. We were supplied a set of "proposed" drain line locations, but some are in different locations, or not there at all. This creates a big challenge for us every time we need to do some digging on the golf course. When the original 1959 irrigation system was replaced in 1992, the irrigation contractor cut across lines all over the course. They repaired the drain lines that were visible to them during the trenching process. The lateral irrigation lines were pulled in place with a vertical plow and since we did not know the location of the drain lines, the plow ripped through drain lines everywhere. Some of these areas showed up the next year, some are just showing up today, 22 years later (I'd say we have repaired 150 drain lines since the new irrigation system was installed.) In all of the areas that we have done drainage work over the past 25 years, we have taken photos and made some drawings so we know where they are located. There are still many lines out there that we have no idea where they go or what gets tied into them. Several months ago a 3 foot deep sinkhole appeared about 20 yards to the left of #4 green. It is in the rough and out of play so not many golfers even knew it was there. Since the course is frozen and closed today, we decided this was the right time to take out our new excavator and start digging.
The photo above shows our Cat 304C excavator which we purchased this past summer. It is used but in very nice condition with just a little over 1100 hours on the meter. Once we started digging we found an old 6" concrete drain line that was broken. We continued digging along the pipe and found several repairs done years ago, more sections of pipe that were broken, and others areas of pipe full of tree roots. There were several large pine trees that were removed at this site four years ago, and two of the trees were planted directly on top of the drain line. This 6" line comes from up by #2 green, and ties into a 12" line near # 4 approach that empties into the creek by # 8 tee. We continued digging and when it was all done, we removed 105'of broken or clogged pipe.
If you look closely at the photo above, you can see this area is full of old tree roots.
The new line is 3 1/2 feet deep. 6" ADS black drain pipe will be installed, covered with four inches of pea gravel, and the rest buried in sand to the surface. The ditch is flowing a steady stream of water, so this area should dry up and be in good shape for another 50+ years.
Steve Kealy
Golf Course Superintendent
The photo above shows our Cat 304C excavator which we purchased this past summer. It is used but in very nice condition with just a little over 1100 hours on the meter. Once we started digging we found an old 6" concrete drain line that was broken. We continued digging along the pipe and found several repairs done years ago, more sections of pipe that were broken, and others areas of pipe full of tree roots. There were several large pine trees that were removed at this site four years ago, and two of the trees were planted directly on top of the drain line. This 6" line comes from up by #2 green, and ties into a 12" line near # 4 approach that empties into the creek by # 8 tee. We continued digging and when it was all done, we removed 105'of broken or clogged pipe.
If you look closely at the photo above, you can see this area is full of old tree roots.
The new line is 3 1/2 feet deep. 6" ADS black drain pipe will be installed, covered with four inches of pea gravel, and the rest buried in sand to the surface. The ditch is flowing a steady stream of water, so this area should dry up and be in good shape for another 50+ years.
Steve Kealy
Golf Course Superintendent
Subscribe to:
Posts (Atom)
-001.jpg)