#9 Drainage Project

#9 drainage project is underway!
The area between the white tee and the fairway on #9 has always been very wet and muddy during the winter months. We built a walk path through the trees off to the right of this area several years ago, but getting to the fairway was still a challenge. Winter boots were necessary, or you could get stuck in the mud. Photos below show the work done so far, and we plan to add more drain lines to the area. We will also topdress the drainage site multiple times between now and May, to help firm up the surface. Thanks to crew members Kyle, Frank, and Vic for leading the way on this project.


View from fairway looking back  toward the tees.
  

                                 View from white tee to fairway.


                                 Trencher shown above in action.