The crew has been busy the past month with bridge deck replacement. The photos below show the bridge connecting 16 tee to 16/17 fairways. The old decking was rotten, so it was time to replace it. The work was led by our old pro Deane, with assistance from Josh, Vic, and Kyle.
The new decking should last for ten years or so. Please stay on the mat when crossing this bridge, or any of the others on the course. When the surface is wet, it can be very slippery.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.